At AeroKool Aviation, we understand that maintaining airworthiness and component reliability hinges on a precise overhaul workflow for rotable units such as pneumatic valves. We are often asked: what is the process for aircraft component overhaul? Our step-by-step guide provides a thorough overview of our aviation MRO solutions for valve services, ensuring quality, traceability, and compliance with FAA, EASA, and AS9110 standards.
Define overhaul requirements
Before any physical work begins, we establish the technical and regulatory criteria that govern the overhaul. Key activities include:
- Reviewing manufacturer time-between-overhaul (TBO) guidance—piston engines typically range from 1,200 to 2,000 hours, while turbine and turboprop powerplants may have intervals from 3,000 to 16,000 hours or more depending on complexity (Wikipedia).
- Assessing duty cycle and operating environment to classify severity levels and risk factors.
- Confirming service bulletins, airworthiness directives and in-service experience for the specific valve model.
- Establishing deliverables: teardown report, dimensional inspection data, material certificates, and final certification tags.
Prepare for overhaul
Accurate preparation streamlines disassembly and minimizes turnaround time. Our pre-overhaul checklist covers:
- Documentation verification: logbooks, repair history and traceability packages.
- Tooling and fixture calibration per AS9110 and OEM requirements.
- Procurement of replacement parts and consumables through our component repair services supply chain, ensuring FAA-PMA or OEM-approved status.
- Allocation of quality personnel trained in pneumatic valve systems and AS9110 quality management.
Disassemble and inspect
We perform controlled teardown in a cleanroom environment to prevent contamination and preserve part provenance. The procedure includes:
- Marking and photographing assemblies for reference
- Sequential removal of fasteners, seals and actuator components
- Initial measurement of critical dimensions against serviceable limits
Non-destructive testing (NDT)
| NDT method | Purpose | Defects detected |
|---|---|---|
| Ultrasonic inspection | Identify internal flaws | Fatigue cracks, delamination |
| Magnetic particle inspection | Surface and near-surface | Cracks, seams |
| Dye penetrant inspection | Surface defect detection | Porosity, minor cracks |
| Eddy current inspection | Conductive material analysis | Corrosion, sub-surface cracks |
Repair and replace parts
Based on teardown and inspection findings, we apply one of three repair pathways:
- Serviceable repair to OEM tolerances using DER-approved procedures
- Replacement of wear-critical components such as seats, O-rings and spools
- Custom re-machining or hard-coating for enhanced durability
All replacement parts carry full traceability and material certification. We document each corrective action in our quality management system to support audit readiness.
Reassemble and calibrate
Reassembly follows strict torque sequences and lubrication protocols:
- Fasteners torqued to OEM-specified values under witness inspection
- Application of aerospace-grade lubricants compatible with service environment
- Bench functional tests, including:
- Leak check at operational pressure for a minimum dwell period
- Actuation cycle test to verify smooth spindle movement
- Response-time and flow-characteristic measurement against baseline data
Certify and deliver
Our final phase ensures every unit meets regulatory and contractual obligations:
- Completion of inspection records and final dimensional check
- Issuance of FAA Form 8130-3 or EASA Form 1 release to service tag
- Packaging in electrostatic-protected, moisture-controlled containers
- Delivery with a comprehensive condition report and maintenance recommendations
Partner with MRO specialists
Choosing the right overhaul partner is critical for lifecycle cost control and safety. Our facility holds FAA Part 145 and EASA Part 145 approvals, AS9110 quality certification, plus OEM authorizations. We integrate seamlessly with your broader aircraft component repair strategy to optimize rotable availability, reduce AOG risk and support inventory forecasting.
Frequently asked questions
- What triggers a pneumatic valve overhaul?
Manufacturers set TBO or time-since-new intervals based on part function. Operational anomalies—such as leakage, inconsistent actuation or contamination—can also prompt an unscheduled overhaul. - How long does a valve overhaul take?
Typical turnaround ranges from 7 to 21 calendar days, depending on inspection findings, parts availability and required NDT procedures. - Are all repairs DER-approved?
Yes. We conduct repairs under Designated Engineering Representative (DER) authority or using FAA-PMA procedures, restoring components to original specifications. - What documentation do we receive?
You’ll get certified inspection reports, material and calibration certificates, and release-to-service tags (FAA 8130-3 or EASA Form 1). - How do we minimize AOG risk during overhaul?
We offer exchange pool programs and loaner units. Advance planning with our supply chain experts ensures you have serviceable valves on hand when needed.

