Quality manager reviewing the NDT sections of a repair station quality control manual against the regulation

Quality Control Manual NDT Procedures: What §145.211 Requires the Manual to Carry

By the AeroKool Aviation team · Hialeah, Florida

Quality control manual NDT procedures are the written rules a certificated repair station has to keep current for inspection work, and they are where almost every recurring obligation around nondestructive inspection actually lives. The manual is the enforceable document, not the regulation, because the regulation delegates the detail to it.

That delegation is easy to miss. §145.211 requires a quality control system acceptable to the FAA that ensures the airworthiness of the articles, requires repair station personnel to follow that system, and then requires the station to “prepare and keep current a quality control manual in a format acceptable to the FAA” containing procedures for a specific list of nine items. Two of those nine decide how nondestructive inspection is governed in practice.

So the answer to almost every hard question about an inspection is a manual section rather than a regulatory citation. This article covers what the manual has to contain, which of the nine procedures reach NDT, what the manual must say that the rule does not, and how revisions work. The rating that authorizes the activity in the first place is the companion question, and the methods a component may be inspected with are the technical half of the same file.

Quality Control Manual NDT Procedures: Where the Regulation Puts Them

Start with the structure of the requirement, because the phrasing sets the expectations for everything that follows.

Prepare, Keep Current, and Follow

Three obligations, and they are separate. The station prepares the manual. It keeps the manual current, which means the document reflects how the work is actually done rather than how it was done when the certificate was issued. And personnel follow the quality control system, which is stated as its own requirement in the section rather than being left to inference.

A manual can be complete, well written and entirely disconnected from the shop floor. That combination is the most common serious finding in the whole subject, and it is not a documentation problem. It is a compliance problem with a documentation symptom.

Acceptable to the FAA, Not Approved by It

The quality control system and the manual are required to be acceptable to the FAA. That is a lower bar in form than approval and it is not a lower bar in consequence, because once the manual exists the station is bound by what it says. A station that writes a stricter rule than the regulation requires has created an obligation it can be audited against.

That is worth knowing in both directions. Do not assume a supplier applies a control it never claimed, and do not assume a control it did claim is optional.

The Nine Procedures of §145.211(c)(1)

The list is worth reading in full, because a manual is usually organized around it and knowing the order makes an audit faster.

Incoming Material, Preliminary Inspection and Hidden Damage

The first three procedures concern what happens before work begins: inspecting incoming raw materials to ensure acceptable quality, performing preliminary inspection of all articles that are maintained, and inspecting all articles involved in an accident for hidden damage before maintenance, preventive maintenance or alteration.

The third one is where nondestructive inspection often enters a shop’s process for the first time, because hidden damage is precisely the class of condition a surface or volumetric method exists to find.

The second is where it enters most often in ordinary work. Preliminary inspection is required on all articles that are maintained, and for a rotating assembly arriving with an unexplained removal, the preliminary inspection is what decides the scope of everything that follows. A manual that describes preliminary inspection as a visual and dimensional check, with no route to a nondestructive method when the removal history suggests a crack, has defined a process that will find what it expects to find.

The first procedure is quieter and it matters for a component shop that fabricates or reworks anything. Inspecting incoming raw materials to ensure acceptable quality is the entry point for material certification, and where a method’s applicability depends on material — magnetic particle testing on ferromagnetic material, for example — the incoming record is the document that decides whether the method was even available.

Proficiency and Noncertificated Persons

The fourth procedure is establishing and maintaining proficiency of inspection personnel. The sixth is qualifying and surveilling noncertificated persons who perform maintenance, preventive maintenance or alterations.

Those two carry the whole personnel side of nondestructive inspection, because part 145 issues no NDT certificate and names no qualification standard. Whatever standard the organization adopted, whatever examinations it administers and whatever recertification interval it applies, all of it sits under those two procedures. The qualification program behind an inspector’s certification is therefore an implementation of the manual, not an alternative to it.

Data, Calibration, Final Inspection and Corrective Action

The fifth procedure is establishing and maintaining current technical data for maintaining articles. The seventh is performing final inspection and return to service of maintained articles. The eighth is calibrating measuring and test equipment used in maintaining articles, including intervals for calibration. The ninth is taking corrective action on deficiencies.

Beyond the nine, the section requires references to the manufacturer’s inspection standards for a particular article, a sample of the forms and instructions the station uses, and procedures for revising the manual and notifying the FAA of those revisions.

Which of the Nine Actually Govern NDT

Two of them do most of the work, and naming them turns a vague audit into a targeted one.

Procedure (iv): Proficiency

Everything a shop does to keep an inspector current is here, and nothing in the regulation says what that has to be. Section §145.155 sets familiarity and proficiency requirements for inspection personnel and contains no interval and no currency requirement, so the interval is whatever the manual says it is.

Ask for the interval in writing. A manual that requires the maintenance of proficiency without defining how it is maintained or evidenced has written an aspiration rather than a procedure.

Procedure (viii): Calibration, Including Intervals

The regulation is unusually specific here, because it names the intervals as part of the procedure rather than as a separate matter. That pairs with §145.109, which requires all test and inspection equipment and tools used to make airworthiness determinations to be calibrated to a standard acceptable to the FAA, and which also requires the documents and data needed for the work to be current and accessible when the work is being done.

The manual has to answer a question the regulation leaves open: what happens to results already taken when an instrument is found out of tolerance. What an NDT equipment calibration program has to demonstrate is the part of this that gets audited backwards, from the finding to the instrument.

What the Manual Has to Say That the Regulation Does Not

Three subjects the regulation does not address and the manual must, because otherwise the shop has no defensible answer when the question arrives.

Method Procedures and Technique Approval

Which methods the station performs, under which written procedures, at which revision, and who approves both. The regulation requires the manual to reference the manufacturer’s inspection standards for a particular article; it does not describe how a shop authorizes a technique for a part number that its existing procedure does not quite fit. That authority has to be named, and the difference between working inside a procedure and owning it is exactly what the manual is defining when it names it.

There is a second half to this that manuals frequently omit: the route a technique question travels. When an article arrives with a geometry, coating or material condition the procedure did not contemplate, someone has to raise the question, someone has to answer it in writing, and the answer has to reach the person at the bench before the work proceeds. A manual that names an approving authority and no route has named a person without giving anyone a way to reach them, and the practical result is a verbal answer that leaves no record. What a written NDT procedure has to contain is the other end of the same requirement.

The Separation of Doer and Inspector

Many shops require that the person who performed the work not be the person who inspects it. §145.213 does not: it requires the article to be inspected before it is approved for return to service by an inspector meeting the §145.155 requirements, and it contains no rule about who did the work.

So where that separation exists, it exists because the manual created it. It cannot be assumed at a supplier who never claimed it, and it cannot be waived at a supplier whose manual does claim it. The manual is the answer to both questions.

Subcontracted Inspection

Which methods are sent out, to whom, under whose procedure, on what qualification basis, and with what surveillance. Procedure (vi) requires the manual to cover qualifying and surveilling noncertificated persons, which is the machinery for outside inspection work, and the record it produces is the only evidence that the arrangement is controlled rather than merely convenient.

An inspection performed by an unsurveilled source can be technically perfect and still leave the release package weak. The chain is the backbone of audit readiness.

Revisions, and Who Has to Be Told

Section §145.211 requires the manual to include procedures for revising it and for notifying the responsible Flight Standards office of those revisions.

Why the Revision Trail Is the Fastest Audit

A manual’s revision history tells you whether the document tracks the shop or lags it. New methods, new equipment, a new subcontractor, a change of Level III authority or a change of adopted qualification standard should each leave a revision behind them. Where the shop’s capability has visibly changed and the manual has not, one of the two is wrong.

The history is also the cheapest possible audit, and it takes minutes. Compare the date of the most recent NDT-related revision against three other dates: the newest article on the capability list, the newest piece of inspection equipment on the calibration register, and the start date of the most recently hired inspector. Where the manual is older than all three, it is documenting a shop that no longer exists.

The Training Program Is a Separate Submission

§145.163 requires an employee training program approved by the FAA, consisting of initial and recurrent training, with training records retained for a minimum of two years, and its revisions are submitted in accordance with §145.209(e). Note the difference in verb: the quality control manual is acceptable to the FAA, and the training program is approved by it. NDT training that lives only inside the quality manual, and never reached the approved program, is a gap that is easy to find.

What AC 145-9A Is For

AC 145-9A, “Guide for Developing and Evaluating Repair Station and Quality Control Manuals,” issued 6 October 2017, is the FAA’s guidance for building and assessing these documents. AC 145-9 without the letter is cancelled, along with its change, and there is no later revision.

What It Does and Does Not Give You

It gives structure, expectations and the agency’s view of what an acceptable manual looks like. It does not give NDT content: nondestructive testing appears in it only in passing, as an example of recurring work that may be performed away from the station’s fixed location. There is no advisory circular that tells a repair station how to write its NDT procedures, which is why the qualification standard the organization adopted carries so much weight.

The Wider Quality Frame

A component shop’s inspection procedures sit inside its broader quality system, and the two published descriptions of that system — how quality assurance procedures are structured and the quality control measures applied during a component repair — are useful context. They are not substitutes for the manual section, because they are descriptions rather than controlled documents.

Common Nonconformities in the Manual’s NDT Sections

  • Proficiency described as maintained without an interval, an examination or an evidence requirement.
  • Calibration intervals defined without a rule for prior results when an instrument is found out of tolerance.
  • A qualification standard named in one section and a different one implied by the certification records.
  • Method procedures referenced by title only, with no revision and no approval signature.
  • Subcontracted methods absent from the manual entirely, and present on purchase orders.
  • Manufacturer inspection standards referenced generically rather than for the particular article.
  • A separation of doer and inspector applied in practice and absent from the manual, or the reverse.
  • Revision history that stops years before the last change in the shop’s actual capability.

What to Ask For, in Order

  • The manual section implementing procedure (iv), establishing and maintaining proficiency of inspection personnel.
  • The manual section implementing procedure (viii), calibration including intervals, and the out-of-tolerance rule.
  • The written procedure for the method that will inspect your article, with its revision and approval.
  • The manual section covering qualifying and surveilling noncertificated persons, plus the surveillance record for the source that will do the work.
  • The revision history of the manual for the last two years.
  • The section of the FAA-approved training program that covers the method.
  • The reference to the manufacturer’s inspection standards for your article, and the revision in use.
  • The corrective action record for the last NDT-related deficiency, whatever it was.

The last one is the most revealing question on the list, because a corrective action record is the only document in the set that nobody prepares in advance for a customer to read.

Frequently Asked Questions

what does §145.211 require in a quality control manual?

Procedures for nine items: inspecting incoming raw materials, preliminary inspection of articles, inspecting accident-involved articles for hidden damage, establishing and maintaining proficiency of inspection personnel, maintaining current technical data, qualifying and surveilling noncertificated persons, final inspection and return to service, calibrating measuring and test equipment including intervals, and taking corrective action on deficiencies. It also requires references to manufacturer inspection standards, a sample of forms, and manual revision procedures.

does part 145 require written NDT procedures?

Not by name. The requirement arrives through §145.211, which requires the manual to carry procedures for the listed items and to reference the manufacturer’s inspection standards for a particular article, and through the manual’s own commitments once written. There is no advisory circular dedicated to NDT procedure content.

is the quality control manual approved or accepted?

Accepted. Section §145.211 requires a quality control system acceptable to the FAA and a manual in a format acceptable to the FAA. The employee training program under §145.163 is different: that one is approved by the FAA, and revisions are submitted in accordance with §145.209(e).

how often do NDT procedures have to be reviewed?

The regulation sets no interval for procedure review; the manual sets it, along with the revision process and the notification to the responsible Flight Standards office that §145.211 requires. In practice a revision should follow any change in method, equipment, subcontractor, adopted standard or approving authority.

who approves an NDT procedure inside a repair station?

The authority the manual names, which is normally the Level III authority for the method, internal or contracted. The regulation does not designate that person, so the manual has to, and an unapproved procedure with a current revision number is a finding in waiting.

does the manual have to cover subcontracted inspection?

Yes, through the procedure for qualifying and surveilling noncertificated persons who perform maintenance, preventive maintenance or alterations. A method sent out and absent from the manual is one of the more common gaps, and it usually surfaces when a release package is reviewed rather than during an audit.


Ask for manual sections by the procedure they implement rather than by subject, because that is how the document is organized and how a gap becomes visible. Proficiency and calibration are the two procedures that carry nondestructive inspection, and a manual that leaves either without an interval and an evidence rule has written a description instead of a control.

About AeroKool Aviation. AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, specializing in the repair and overhaul of environmental control system components — air cycle machines, cooling turbines, heat exchangers, refrigeration packages, valves and environmental control units — for commercial, regional, business jet, rotorcraft and military operators. The company was founded in 1959 and holds AS9110C and AS9100D registrations, with in-house PMA parts manufacturing and FAA DER repair engineering. Component capability is organized by aircraft category, manufacturer, model and component type in the component capability listing, down to individual part numbers such as this heat exchanger for a widebody platform.

This article is general technical information about the quality control manual requirements that govern inspection at a certificated repair station. It is not approved data, it is not a maintenance procedure, and it does not replace the component maintenance manual, structural repair manual, service bulletin, airworthiness directive or other airworthiness data your organization is approved to use. Regulations and advisory material are revised, and the requirements that apply to a specific job depend on the article, the ratings held, the contents of the station’s own manual and the operator’s approved program. Verify the applicable requirements against the current regulatory text, your own quality control manual, and your FAA principal inspector before performing or accepting any maintenance action.

Talk to AeroKool Aviation

AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, overhauling air cycle machines, cooling turbines, heat exchangers, valves and environmental control units for commercial, regional, business and military operators since 1959, with an AS9110C quality system and in-house PMA and DER engineering. If you have a component on the bench, a repeat removal you cannot explain, or a part number you cannot source, we will tell you what falls inside our ratings and what does not. Request a quote with the part number and the work you need done, and the answer will name the scope it falls under.

Address
1495 S.E. 10th Avenue Hialeah, FL 33010-5984
eMail
aerokool@aerokool.com | sales@aerokool.com
Phone
305.887.6912 | 800.458.4255

Scroll to Top

Have Questions Or Need Information?

Please fill out the form below to contact us and we will get back to you as soon as possible.
Request a Quote
Choose one for Sales and Repair Services
We're committed to your privacy. AeroKool Aviation uses the information you provide to us to contact you about our relevant content, products, and services. You may unsubscribe from these communications at any time. For more information, check out our Privacy Policy.

Looking for parts?

You can search by Part Number or Aircraft Model

Search for Parts

Browse our extensive inventory

Note: You can search by part number

Your Aircraft

Browse our extensive inventory

Note: You can search by aircraft name