By the AeroKool Aviation team · Hialeah, Florida
Overhauled and rebuilt are the two terms that 14 CFR §43.2 defines, and each one commits the shop that uses it to a specific set of things having been done and tested. Repaired is the third word in everyday use and the regulation does not define it in that section at all, which is exactly why it absorbs the work that does not qualify for the other two.
Three words, two definitions, and a great deal of loose usage in between. The looseness matters because a tag is read by people with no access to the work order: an operator deciding whether to install, a lessor valuing an asset, an auditor reconstructing what happened, a buyer years later. All of them read one word and infer a scope of work from it.
So the terminology decision is not a clerical step at the end of a job. It is a commitment made in language, and it has to be made before the tag is written rather than while it is being written. Get it wrong and the data basis and the record stop agreeing with each other, which is the condition an auditor is looking for.
Prerequisites: What Has to Be Settled Before Anyone Writes a Tag
Do not leave this to the person holding the pen at the end of the job. Settle four things first.
Put the text of §43.2 in the work instruction
Reproduce it, do not paraphrase it. 14 CFR §43.2, “Records of overhaul and rebuilding,” is two short paragraphs, and its section title tells you what it governs. An instruction that summarizes the two definitions in a shop’s own words is an instruction that will drift, and the drift always runs in the same direction: toward the more impressive word.
Note the framing of paragraph (a) as well. It is written as a prohibition — no person may describe an article as overhauled unless certain things are true — rather than as a permission. That matters for how the decision is approached: the default is that the word is unavailable until the conditions are met.
Identify what data the job was performed under
The terminology decision depends on the data, so the data has to be settled first. Establish whether the work was performed under the manufacturer’s data at its current revision, and whether the testing standard the definitions require is available to you.
That second half is the one that decides most cases and the one most often skipped. Both defined terms carry a testing requirement, and both point that requirement at standards developed outside the shop. If those standards are not available for the article in front of you, neither defined term is available either, whatever was done to the component mechanically. Settle it at intake, not at the end.
Establish who chooses the word, and who cannot
Name the role. The person who performed the work should not be the person who selects the term, for the same reason inspection is separated from production. And the person selecting it should be able to point to the paragraph they relied on.
Decide what the release document will carry
The word appears in more than one place, and the places have to agree. Decide in advance how the term on the release relates to the maintenance record entry, because a release document is read by people who will never see the record and a mismatch between the two is discovered by exactly those people.
Step 1: Establish Whether “Overhauled” Is Available at All
Two conditions, and both have to be met. Test them separately.
check the five actions in the first condition
Section 43.2(a)(1) requires that, “Using methods, techniques, and practices acceptable to the Administrator,” the article “has been disassembled, cleaned, inspected, repaired as necessary, and reassembled.” Five actions, and the fourth is conditional on need while the other four are not.
Read what that excludes. An article that was tested and adjusted without being disassembled has not been overhauled, however thoroughly it was exercised. Bench testing is not disassembly, and a tag that says otherwise misdescribes the work in a way that is checkable from the work order.
check the testing standard in the second condition
Section 43.2(a)(2) requires that the article “has been tested in accordance with approved standards and technical data, or in accordance with current standards and technical data acceptable to the Administrator, which have been developed and documented by the holder of the type certificate, supplemental type certificate, or a material, part, process, or appliance approval under part 21 of this chapter.”
Note that both the approved and the acceptable standards appear in one sentence, which makes this one of the clearest places in the regulation where the two data standards sit side by side. Note also the closing clause: the standards have to have been developed and documented by the holder of a type certificate, a supplemental type certificate or a Part 21 approval. A test standard the shop developed for itself does not satisfy that clause.
Step 2: Test the Job Against the Stricter Standard for “Rebuilt”
Rebuilt is not a synonym for a thorough overhaul. It is a higher bar with a different reference point.
apply the new-item benchmark
Section 43.2(b) bars describing an article as rebuilt “unless it has been disassembled, cleaned, inspected, repaired as necessary, reassembled, and tested to the same tolerances and limits as a new item, using either new parts or used parts that either conform to new part tolerances and limits or to approved oversized or undersized dimensions.”
The benchmark shifts from the manufacturer’s overhaul standard to new-item tolerances and limits. That is the whole distinction, and it is a much harder thing to evidence.
Notice that the list of actions is the same as for overhauled. Rebuilt is not a longer process; it is the same process measured against a different reference. So a shop cannot reach rebuilt by working harder or by adding steps. It reaches it by being able to show that the finished article meets new-item tolerances and limits, which is an evidence question rather than an effort question.
That has a practical consequence for quoting. A customer asking for a rebuilt component is asking for a specific evidentiary position, and a shop that cannot reach it should say so at the quotation rather than deliver an overhauled component with a rebuilt tag. The second option costs more later than the first costs now.
check the parts provision, which is where most claims fail
The same paragraph is specific about parts. Rebuilt permits new parts, or used parts that conform to new part tolerances and limits, or used parts conforming to approved oversized or undersized dimensions. It does not permit used parts that merely fall inside serviceable limits.
That distinction is the practical test. A component reassembled with parts within serviceable limits has been overhauled at best, not rebuilt, and the parts record is where the claim is checked.
Step 3: Use “Repaired” Deliberately, Not by Default
The third word is the one with room in it, and room is exactly what invites misuse.
recognize that §43.2 does not define it
Section 43.2 governs records of overhaul and rebuilding. It says nothing about the word repaired, which means repaired is not a lesser grade on the same scale — it is a description of a different kind of event, correcting a specific condition rather than restoring an article to a standard.
Use it for what it is. A repair addresses a finding; an overhaul restores an article. Those are different claims about different work, and a tag that says repaired is not a weaker version of a tag that says overhauled.
and that its own constraints come from elsewhere
What governs a repair is the classification and the data. 14 CFR §1.1 sets the major-and-minor test, and that classification decides who must approve the data behind the work. Separately, §43.13(b) requires the condition of the article afterwards to be “at least equal to its original or properly altered condition (with regard to aerodynamic function, structural strength, resistance to vibration and deterioration, and other qualities affecting airworthiness).”
So repaired carries obligations too. They are just located in different provisions, and a shop that reads §43.2 alone will conclude the word is unconstrained, which it is not.
There is also a commercial reason to use the word deliberately rather than apologetically. A tag saying repaired, with a clear statement of what condition was corrected and under what data, is more informative to the next reader than a tag saying overhauled that cannot survive a question. Precision reads as competence in this field, and vagueness reads as something else.
And where the same component comes back, the earlier word is part of the evidence. A component described as repaired and then removed for the same condition is a traceable pattern; the same component described as overhauled has had its history obscured by a word that promised more than was done.
Step 4: Write the Record So the Word and the Data Agree
The word is one element of the entry. The entry has other elements and they have to be consistent with it.
match the term to the data reference
14 CFR §43.9(a) requires the entry to contain “A description (or reference to data acceptable to the Administrator) of work performed,” the date of completion, the name of the person performing the work where different from the approver, and the signature and certificate details of the person approving it.
Read the first element against the term you chose. A tag saying overhauled, referencing data that contains no test standard developed by a type certificate holder, is internally inconsistent, and the inconsistency is visible without inspecting the component.
check that the release says the same thing
The release document is where the word travels. Where a component is released on an FAA Form 8130-3, the term on the tag and the entry in the record are read together by whoever receives it, and a discrepancy between them is a finding the shop cannot explain away later, because both documents were written at the same time by the same organization.
The check is mechanical and takes seconds. Read the term on the release, read the description or data reference in the record, and confirm that a reader with only those two lines would draw the same conclusion from each. Where the two were populated from different fields in different systems, that comparison will not happen by itself.
keep the reasoning, not just the result
Record which paragraph the term was chosen under, not only the term. A note saying that overhauled was selected against §43.2(a) with the test standard identified takes one line and answers the only question anyone will ask about it later.
Without that line the determination is invisible, and an invisible determination is indistinguishable from a habit. Months later nobody remembers whether the word was chosen or defaulted to, including the person who wrote it.
Common Terminology Problems and How to Trace Them
Three patterns, and each one traces back to a specific document.
the tag says overhauled and the work order says test and adjust
Trace it to the work order. If the component was not disassembled, the first condition of §43.2(a) was not met, whatever the test results showed. This is the most common of the three and the easiest to find, which is also why it is the first thing a competent auditor looks for: it needs no technical knowledge of the component, only two documents side by side.
the tag says rebuilt and the parts record shows serviceable-limit parts
Trace it to the parts record. Rebuilt requires new parts, or used parts conforming to new part tolerances and limits, or approved oversized or undersized dimensions. Serviceable-limit parts do not appear on that list.
the tag says overhauled and the test standard was the shop’s own
Trace it to the test data. Section 43.2(a)(2) requires standards developed and documented by the holder of a type certificate, supplemental type certificate or a Part 21 approval. An internally developed acceptance test, however competent, does not satisfy the clause, and approved data comes from a defined set of sources.
Warning Signs of a Minimum-Standard Approach
Watch for a shop where every component leaves overhauled, regardless of scope. Uniformity in this field is not consistency; it means the word is a template rather than a determination. Watch for a work instruction that summarizes §43.2 instead of reproducing it, and for one that has no step at which the term is chosen — which usually means it is chosen by whoever prints the tag.
Watch for the term selected by the technician who did the work, with no separation of the decision. Watch for a release and a record that were populated from different fields and never compared. And watch for a supplier who answers a question about terminology with a reassurance about quality, because the question was not about quality: it was about which paragraph they relied on.
Expected Outcome: A Tag That Means What the Next Reader Thinks It Means
Done properly, this produces a small and durable thing: for each component, a term chosen against a named paragraph, a data reference that supports it, a parts record consistent with it, and a release that carries the same word as the maintenance entry.
That consistency is what survives a change of ownership, an audit or a warranty dispute. It is also what makes a repair-or-replace comparison honest, because two bids describing themselves with the same word are only comparable if both used it under the same rule — and a buyer comparing an overhauled quote against a rebuilt one is comparing two different evidentiary positions, not two prices.
In a market where the same part number may not be available at all next year, the record you write today is the only description of the component that will still exist. The component will outlive the work order, the technician, the quotation and possibly the shop. One word on a tag is what carries forward, and it carries whatever meaning the regulation gives it rather than whatever meaning was intended.
Frequently Asked Questions
what is the difference between overhauled and rebuilt?
Both are defined in §43.2 and rebuilt is the stricter of the two. Overhauled requires disassembly, cleaning, inspection, repair as necessary and reassembly, with testing against standards developed by a type certificate, supplemental type certificate or Part 21 approval holder. Rebuilt requires the same actions plus testing to the same tolerances and limits as a new item, with parts that are new or that conform to new part tolerances or approved oversized or undersized dimensions.
is repaired defined in the regulations?
Not in §43.2, which is why the word has more room in it than the other two. What governs a repair is located elsewhere: §1.1 sets the major-and-minor classification, and §43.13(b) requires the condition afterwards to be at least equal to the article’s original or properly altered condition.
can a component be described as overhauled if it was not disassembled?
No. Section 43.2(a)(1) requires the article to have been disassembled, cleaned, inspected, repaired as necessary and reassembled. Testing and adjustment without disassembly does not satisfy that condition, however thorough the testing was.
does rebuilt allow used parts?
Yes, on conditions. Section 43.2(b) permits new parts, used parts conforming to new part tolerances and limits, or used parts conforming to approved oversized or undersized dimensions. Used parts that merely fall inside serviceable limits are not on that list, which is where most rebuilt claims actually fail.
who should choose the term?
Not the person who performed the work, for the same reason inspection is separated from production. Name the role in the procedure, and require whoever holds it to be able to identify the paragraph they relied on. A term chosen by whoever prints the tag is not a determination.
why does the word matter if the work was done well?
Because the word is what travels. An operator deciding whether to install, a lessor valuing an asset and an auditor reconstructing the job all read the term without access to the work order, and each infers a scope of work from it. A well-performed job described with the wrong word is a record problem, and record problems are what audits find.
Reproduce §43.2 in the instruction, choose the term at a defined step rather than at the printer, and check the parts record before anyone writes rebuilt. The work is judged later by one word, and that word is the only part of the job the next reader will ever see.
About AeroKool Aviation. AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, specializing in the repair and overhaul of environmental control system components — air cycle machines, cooling turbines, heat exchangers, refrigeration packages, valves and environmental control units — for commercial, regional, business jet, rotorcraft and military operators. The company was founded in 1959 and holds AS9110C and AS9100D registrations, with in-house PMA parts manufacturing and FAA DER repair engineering. Its engineering, manufacturing and repair management programs are described on the site, and component capability is organized by aircraft category, manufacturer, model and component type in the component capability listing, down to individual part numbers such as this heat exchanger for a wide-body platform.
This article is general technical information about the maintenance record terminology defined in 14 CFR §43.2 and the provisions that constrain a repair. It is not approved data, it is not a maintenance procedure, and it does not replace the component maintenance manual, service bulletin, airworthiness directive or the recordkeeping procedures your organization is approved to use. Regulations and manufacturer data are revised, and which term applies to a specific job depends on what was actually done, the test standards available and the data the work was performed under. Verify the applicable terminology and record content against the current text of Part 43, your own quality system, and your FAA principal inspector before signing any record or release.
Talk to AeroKool Aviation
AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, overhauling air cycle machines, cooling turbines, heat exchangers, valves and environmental control units for commercial, regional, business and military operators since 1959, with an AS9110C quality system and in-house PMA and DER engineering. If you have a component on the bench, a repeat removal you cannot explain, or a part number you cannot source, we will tell you what falls inside our ratings and what does not. Request a quote with the part number and the register the aircraft is on, and the answer will name the data basis.
Address
1495 S.E. 10th Avenue Hialeah, FL 33010-5984
eMail
aerokool@aerokool.com | sales@aerokool.com
Phone
305.887.6912 | 800.458.4255