Level III authority approving a written nondestructive inspection procedure for an aircraft component

NDT Written Procedure Requirements: What the Document Has to Say and Who Approves It

By the AeroKool Aviation team · Hialeah, Florida

NDT written procedure requirements come from three places at once: the repair station’s own quality control manual, the manufacturer’s data for the article, and the qualification standard the organization adopted. No regulation writes the document for you, and no advisory circular tells you what belongs in it.

That is worth stating plainly because it is easy to assume otherwise. §145.211 requires a quality control manual, in a format acceptable to the FAA, containing procedures for nine listed items and references to the manufacturer’s inspection standards for a particular article. The FAA’s guidance for building and evaluating those manuals, AC 145-9A of 6 October 2017, mentions nondestructive testing only in passing. AC 25-29 addresses developing an inspection program and organization rather than the content of a technique.

So the procedure is where the organization’s engineering judgement becomes an auditable document, and an inspection performed to a method rather than to a procedure cannot be repeated. The steps below are program steps — how the document is built, demonstrated, approved and controlled — and not bench parameters, because every parameter for a specific article comes from the manufacturer’s data. The methods a component may be inspected with are the wider frame, and the quality manual sections that require this document are its authority.

Prerequisites: What Has to Exist Before Anyone Drafts

  • The governing manual section, so the procedure is written into a structure the FAA has already found acceptable rather than beside it.
  • The manufacturer’s data for the articles in scope, current and accessible as §145.109 requires, because it supplies the technique requirements and the acceptance criteria.
  • The adopted qualification standard, since it defines the levels the procedure will reference.
  • The approving authority, named — normally the Level III authority for the method, internal or contracted.
  • The equipment and reference standard inventory, so the document specifies items that exist and are controlled.
  • Any customer specification flowed down to the work, resolved against the other two sources before drafting rather than after.

Step 1: Establish Which Document You Are Writing

Programs get into trouble here before a single parameter is chosen, because two different documents are both called the procedure.

separate the method procedure from the part technique

A method procedure governs how the organization performs a method in general: the system, the controls, the qualifications, the records. A technique applies that method to a specific article or family: what is examined, from where, with what configuration, against what artefact, and what constitutes coverage. Most shops need both, and conflating them produces a document too general to follow and too specific to reuse.

The two also change at different rates, which is the practical argument for keeping them apart. A method procedure changes when the shop’s system changes — new equipment, a new material system, a new adopted standard — and that happens rarely. A technique changes whenever a new part number enters the capability, and that happens continuously. Merged into one document, every new article forces a revision of the whole thing, and the revision burden is what makes a library go stale.

There is a third document in the set that shops often forget to name: the work instruction the technician actually reads at the bench. Whether that is the technique itself or a card derived from it is a decision for the manual, and either answer is defensible as long as the derivation is controlled. What is not defensible is a card in daily use that nobody can trace to an approved technique.

decide the scope and write the boundary into the document

Which articles, materials and configurations the document covers, and what happens when something arrives outside them. A procedure with no boundary implies it covers everything, and the first article that falls outside gets processed anyway under a basis nobody approved.

⚠️ The boundary is the single most useful sentence in the document, and the one most often missing. Without it there is no trigger for the technique question that should have been asked.

Step 2: Anchor the Procedure in the Data That Governs the Article

A procedure’s authority comes from what it cites, and citing the wrong thing is worse than citing nothing.

cite the manufacturer’s data first, by revision

The component maintenance manual, overhaul manual or service bulletin for the part number governs both technique requirements and acceptance criteria. Section §145.211 requires the manual to include references to the manufacturer’s inspection standards for a particular article, and §145.109 requires that data to be current and accessible while the work is being done. A procedure that names the data generically has left the revision question to whoever pulls the file.

cite an industry practice only where it actually applies

A published practice is a legitimate reference inside its own scope and a liability outside it. A practice written for wrought products does not cover castings; a practice written for tubular products does not cover a machined housing; and for one method there is no general practice at all to cite. Where the article falls outside every available practice, the honest construction is to say so and rely on the data and a demonstrated technique.

The failure mode is specific and it survives review. A citation implies a basis, so a procedure that names a practice its article falls outside reads as well-founded to everyone who does not check the practice’s scope — and almost nobody checks, because the citation looks like diligence. An auditor who does check has found two problems at once: the basis is unsupported, and the document’s references were never verified.

There is also a reason to record what was considered and rejected. A short note saying which practices were reviewed and why they do not apply converts an apparent omission into a documented engineering decision, and it answers the question a customer would otherwise ask twice.

resolve the three sources before the first line

Manufacturer’s data, adopted standard and customer specification have to agree, and where they conflict the resolution is decided and recorded before the work. A supplier who cannot say which of the three governs has three documents and no answer.

Step 3: Specify the System, Not Just the Steps

This is the substance of the document, and the test of whether it was engineered or described.

name every element the result depends on

Equipment type and configuration, the reference standard by identification, the process or reading conditions, the coverage the technique achieves and the regions excluded, the qualification level required to perform and to interpret, and the acceptance basis by reference to the data. Vocabulary matters throughout: ASTM E1316-26b is the standard terminology for nondestructive examinations, and using indication, discontinuity and defect precisely is what keeps a report from becoming an argument.

Two elements are worth calling out because they are routinely left implicit. The first is the condition the article has to be in before the method is applied — surface state, cleanliness, coating, disassembly level — and what is permitted to change that condition, which comes from the data rather than from convenience. The second is the responses the technique expects to see that are not damage: the signals geometry produces. A document that does not describe them leaves the reader to decide part by part, and that is where two competent inspectors reach two conclusions while both follow the procedure.

The third omission is quieter: what to do when the result is ambiguous. A procedure that only describes accept and reject has no route for the case that actually consumes a day, and the route — who is consulted, what is repeated, what the record says about it — should be written before it is needed rather than improvised at the bench.

state coverage and exclusions explicitly

What volume or surface the technique examines, and what it does not reach. A document claiming complete coverage on an article with inaccessible features has claimed something the geometry does not permit, and what a detection result actually proves depends entirely on that statement being accurate.

tie the equipment to the calibration program

Every device the result depends on falls under §145.109(b), which requires calibration to a standard acceptable to the FAA, and the intervals live in the manual under §145.211. The procedure should reference the program rather than restate it, so that what the calibration program demonstrates stays in one place and cannot drift between two documents.

Step 4: Demonstrate the Technique and Record the Demonstration

A technique is not established by being written. It is established by being shown to work.

show the expected response on known features

Demonstration means producing the response the technique predicts, on features of known size and location, in a reference standard representative of the article, under the conditions the document specifies. That record is the evidence a customer can ask for and the difference between a technique that was engineered and one that was drafted.

Representative is the word doing the work. An artefact of the right material, in the right form, with the relevant geometry and surface condition tells you something about the article; an artefact chosen because it was in the drawer tells you about the artefact. Where no representative standard exists, the technique’s limitation belongs in the document rather than in the hope that the difference does not matter.

record who witnessed it and what was observed

Date, article or representative standard, equipment and artefact identified individually, conditions, the responses observed, and the authority who accepted the demonstration. A demonstration nobody recorded is indistinguishable from one that never happened.

⚠️ Re-demonstration triggers belong in the document too: a change of equipment, probe, material system, artefact or specification is a reason to repeat the demonstration rather than to assume it still holds.

Step 5: Fix Approval, Revision and Distribution

The last step is administrative and it is where most findings are actually written.

name the approving authority and record the approval

AC 65-31B describes Level III personnel as interpreting the codes, standards and other regulatory documents that control the methods used by the organization, which is the function that approves a procedure. Where that authority is contracted, the agreement has to say what the person may approve. Whether the shop owns the method authority or borrows it determines how fast a technique question gets answered and how well it gets documented.

control revisions, and tell the people who use the document

Every revision identified, the change described, the approval recorded, and the superseded version withdrawn from the floor. Section §145.211 requires the manual to include procedures for revising it and for notifying the responsible Flight Standards office, and a technique library that grows without withdrawals eventually has two current versions of the same document.

Withdrawal is the step that gets skipped, and it is the one that causes the visible damage. A superseded technique left in a binder, on a shared drive or taped inside a cabinet door will be used, because it is closer to hand than the current one. The revision procedure therefore has to say where controlled copies live, who removes the old ones, and how a technician confirms that what they are reading is current before they start.

Distribution also has a customer dimension. Where a specification requires procedures to be submitted or approved by the customer, a revision that was not sent has quietly put the work outside the contract even though it improved the technique. That obligation belongs in the revision procedure alongside the internal steps, not in somebody’s memory of what the contract said.

keep personnel authorizations aligned with the document

The procedure names levels; the personnel records have to show people qualified at those levels for that method. Section §145.155 requires inspection personnel to be thoroughly familiar with the methods and proficient with the equipment appropriate for the article, and the standard and interval behind that come from the qualification program the organization built.

Common Procedure Problems and How to Trace Them

  • A procedure referenced by title with no revision. Compare the work record to the document library and see whether anyone can establish which version applied.
  • A citation to a practice that does not cover the article. Check the material form and the section against the practice’s own scope.
  • Acceptance criteria written into the procedure. Trace them to the data: criteria belong to the manufacturer’s data, and a procedure that restates them will eventually contradict a revision.
  • A technique with no demonstration record. Ask for the demonstration; its absence means the technique was drafted rather than established.
  • Coverage described as full on an article with unreachable features. Compare the claim to the geometry.
  • Two current versions in circulation. Trace the withdrawal step in the revision procedure.
  • Levels named in the procedure with nobody qualified at them. Compare the document to the personnel roster.
  • A customer specification accepted at order entry and absent from the procedure. Trace the flow-down: this is where most contractual findings originate.

Warning Signs of a Minimum-Standard Approach

  • No boundary statement, so the document implicitly covers every article.
  • No named approving authority, or one who has not signed anything in the period under review.
  • Equipment described generically rather than by type and configuration.
  • Reference standards described by class rather than by individual identification.
  • No re-demonstration triggers, so nothing prompts a review when the system changes.
  • Revision history that stops before the last change in equipment or personnel.
  • The same document used as method procedure and part technique for everything.
  • Exclusions absent, so a reader assumes the whole article was examined.

Expected Outcome: A Document Somebody Else Can Follow

A defensible procedure lets a competent stranger reproduce the inspection and reach the same conclusion. That means the article scope and its boundary, the governing data by revision, the system specified element by element, the coverage and the exclusions stated, the qualification levels named, the acceptance basis referenced rather than restated, and an approval and revision history that can be traced.

With that in place, a disputed result becomes a technical review of a documented process. Without it, the review becomes an inquiry into what somebody remembers doing, and the records the inspection left behind will not be able to close the gap.

Frequently Asked Questions

does part 145 require a written NDT procedure?

Not in those words. Section §145.211 requires a quality control manual containing procedures for the listed items and references to the manufacturer’s inspection standards for a particular article, and the manual’s own commitments then bind the organization. No advisory circular specifies the content of an NDT procedure, which is why the manufacturer’s data and the adopted qualification standard carry the weight.

who approves an NDT written procedure?

The authority the organization’s program designates, normally the Level III authority for that method. AC 65-31B describes Level III personnel as interpreting the codes, standards and other regulatory documents that control the organization’s methods. Where the function is contracted, the written agreement should state what that person may approve.

what is the difference between a procedure and a technique?

Scope. A method procedure governs how the organization performs a method in general, including controls, qualifications and records. A technique applies that method to a specific article or family, with the configuration, coverage and reference standard for that part. Most shops need both documents, and conflating them weakens each.

should acceptance criteria be written into the procedure?

They should be referenced, not restated. The criteria belong to the approved data for the part number, and a procedure that copies them will eventually contradict a revision of the source. Referencing the data by revision keeps one authority for the criteria.

how often does an NDT procedure have to be revised?

The regulation sets no interval; the manual sets the revision process, and events set the timing. A change of equipment, probe, material system, reference standard, adopted standard, approving authority or customer specification is a reason to review and, where warranted, re-demonstrate and revise.

what evidence shows a technique actually works?

A demonstration record: the expected responses produced on features of known size and location in a representative reference standard, under the specified conditions, with equipment and artefact identified individually, accepted by the named authority and dated. That record is what turns a written technique into an established one.


Write the boundary first and the parameters last, because the boundary is what tells anyone when the document has run out. Reference the acceptance criteria rather than copying them, record the demonstration that shows the technique works, and keep one current version on the floor — those four habits close most of the findings this subject produces.

About AeroKool Aviation. AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, specializing in the repair and overhaul of environmental control system components — air cycle machines, cooling turbines, heat exchangers, refrigeration packages, valves and environmental control units — for commercial, regional, business jet, rotorcraft and military operators. The company was founded in 1959 and holds AS9110C and AS9100D registrations, with in-house PMA parts manufacturing and FAA DER repair engineering. Component capability is organized by aircraft category, manufacturer, model and component type in the component capability listing, down to individual part numbers such as this air cycle machine for a single-aisle platform.

This article is general technical information about written procedures for nondestructive inspection at a certificated repair station. It is not approved data, it is not a maintenance procedure, and it does not replace the component maintenance manual, structural repair manual, service bulletin, airworthiness directive or other airworthiness data your organization is approved to use. Regulations, advisory material, standards and manufacturer data are revised, and the parameters, coverage and acceptance criteria that apply to a specific inspection depend on the part number, the material, the geometry and the scope of the repair station’s certificate. Verify the applicable requirements against the current manufacturer data, your own quality control manual, and your principal inspector or Level III authority before performing or accepting any inspection.

Talk to AeroKool Aviation

AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, overhauling air cycle machines, cooling turbines, heat exchangers, valves and environmental control units for commercial, regional, business and military operators since 1959, with an AS9110C quality system and in-house PMA and DER engineering. If you have a component on the bench, a repeat removal you cannot explain, or a part number you cannot source, we will tell you what falls inside our ratings and what does not. Request a quote with the part number and the condition you need resolved, and the answer will name the scope it falls under.

Address
1495 S.E. 10th Avenue Hialeah, FL 33010-5984
eMail
aerokool@aerokool.com | sales@aerokool.com
Phone
305.887.6912 | 800.458.4255

Scroll to Top

Have Questions Or Need Information?

Please fill out the form below to contact us and we will get back to you as soon as possible.
Request a Quote
Choose one for Sales and Repair Services
We're committed to your privacy. AeroKool Aviation uses the information you provide to us to contact you about our relevant content, products, and services. You may unsubscribe from these communications at any time. For more information, check out our Privacy Policy.

Looking for parts?

You can search by Part Number or Aircraft Model

Search for Parts

Browse our extensive inventory

Note: You can search by part number

Your Aircraft

Browse our extensive inventory

Note: You can search by aircraft name