By the AeroKool Aviation team · Hialeah, Florida
NDT Level II vs Level III is the difference between a person who conducts and documents an inspection under an existing procedure and a person who decides what that procedure says. It is a division of authority, not a ranking of skill.
The distinction carries more weight in aerospace than the numbering suggests, because the level structure is the only part of nondestructive inspection qualification that is described directly by the FAA. AC 65-31B sets out what each level does, and it does so in an environment where, by its own statement, “there is no national certification requirement or standard to determine that NDI personnel are qualified to accomplish NDIs.” The levels are the common vocabulary; the requirements behind them come from whichever standard the employer adopted.
That makes one question decisive when evaluating a shop: does it hold its own Level III authority, or does it borrow one. This article covers how the FAA describes each level, what a Level III actually approves, why a Level III is neither a supervisor nor a signatory of the maintenance release, and what to verify. The methods a component may be inspected with are the technical half of the same evaluation.
NDT Level II vs Level III as the FAA Describes the Levels
The descriptions below are the FAA’s own, from AC 65-31B, rather than a paraphrase of a paid standard. They are worth using because they are free to cite, they are the ones an inspector will recognize, and they focus on decisions rather than on hours.
Level I
Level I personnel perform specific tests, specific calibrations, specific interpretations, and evaluations for acceptance or rejection. Read the repetition of the word specific. A Level I works inside a boundary drawn by someone else, on defined operations, and the acceptance decisions available are the ones the procedure enumerates.
The level is frequently misread as trainee status. It is not: a Level I performs real inspections and makes real acceptance and rejection calls, on operations that were defined and delegated in advance. What the level does not include is deciding which operations those are.
Level II
Level II personnel set up and standardize equipment, conduct tests, and interpret, evaluate and document results in accordance with procedures. This is the level that carries most production inspection in a component shop, and the phrase that defines it is in accordance with procedures.
A Level II can be entirely competent and still have no authority to change the technique when the article does not match the procedure. That constraint is the point of the level, not a limitation of the person.
Level III
Level III personnel interpret codes, standards and other regulatory documents that control the methods used by the organization. That is an authority over documents, which is why it sits at the top of the structure. The Level III decides what the organization’s methods are, in writing, and everything the other levels do happens inside those decisions.
The Real Boundary: Executing a Method and Owning It
Between Level II and Level III there is a change of kind rather than a change of degree, and it is the boundary that matters commercially.
Inside the Procedure, and Over the Procedure
A Level II applies a technique to an article and records what happened. A Level III writes or approves that technique, establishes the acceptance basis it references, defines the equipment and reference standards it requires, and decides whether a new article, material or geometry is covered by an existing procedure or needs a new one.
So when a part arrives that the existing procedure does not quite fit, the question is not whether anyone in the shop is skilled enough to inspect it. The question is whether anyone in the shop is authorized to say how. Skill is not authority.
The boundary shows up in three recurring situations, and they are worth recognizing because they arrive without warning. A part number appears with a geometry, coating or material condition the procedure did not contemplate. An indication falls into a category the acceptance basis does not clearly address. Or an equipment change alters a parameter the technique specified. In each case a Level II can describe the problem accurately and cannot resolve it, and the resolution has to be documented rather than agreed at the bench.
Why This Decides Repeat Findings
A shop without its own Level III authority has to route every technique question outward, which is workable when the arrangement is defined and slow when it is not. The observable symptom is a procedure library that never changes while the mix of articles does, and inspections performed under techniques written for something adjacent.
An inspection can be performed correctly under a procedure that was never right for the part. Ownership of the procedure is what prevents that, which is why what an NDT written procedure has to contain is the document a supplier audit should reach for early.
What a Level III Actually Approves
The role is easier to evaluate as a list of signatures than as a job description, because each item is a document you can ask to see.
Procedures, Techniques and Reference Standards
The Level III approves the written procedure for a method and, where the organization works that way, the part-specific technique underneath it. That includes the reference standards the technique calls for and the condition those standards have to be in, which is where a great deal of inspection reliability actually lives.
Reference standards deserve their own question during an audit, because they are physical objects that wear, corrode and get lost. A technique that calls for a specific reference standard is only as good as the control over that item: its identification, its verification history, its storage, and the rule for what happens when it is damaged or superseded. Where a shop cannot produce the control record for the reference standard a technique names, the technique is nominal rather than operative. A procedure that cites a standard nobody can find is a procedure in name only.
Examinations, Equipment and Interpretation Disputes
The Level III typically administers or approves the examinations that qualify Level I and Level II personnel, approves the equipment and its configuration for a method, and resolves interpretation disputes when a Level II result is challenged. Each of those functions produces a record, and the records are how the authority is evidenced rather than asserted.
Note the loop this closes. The person who defines the technique also defines the examination on which the people applying it are qualified, which is efficient and concentrated. It is also the reason a program with a single external Level III and no internal backup has a single point of failure, and what the equipment calibration program has to demonstrate is one of the places that failure shows up first.
An Outside Level III Is Legitimate, and Needs Terms
Many well-run shops do not employ a Level III in every method. Contracting the function is normal and acceptable, and the risk is not the arrangement. It is an arrangement with no written scope.
What the Agreement Has to Define
Which methods the external Level III covers, which documents that person approves, how a technique question is raised and how quickly it is answered, whether the person may approve examinations for the shop’s personnel, and what happens when the individual becomes unavailable. Without those terms, the shop has a name in a file rather than a function in a process.
Response time is the term most often omitted and the one that matters most to a customer waiting on a component. If a technique question has to reach an external authority who visits quarterly, the turnaround on any part that falls outside the existing procedure is measured in weeks rather than days, and nothing in the shop’s published lead time will say so. Ask how many technique approvals were issued in the last twelve months. A function that is genuinely in use leaves a trail; one that exists on paper does not.
The Audit Signature of an Undefined Arrangement
Procedures signed years ago with no revision history, technique questions resolved verbally, examinations administered by whoever was available, and a consultant named in the quality manual who has not visited the facility in the period under review. None of these is fraud. All of them are findings, and they cluster.
Level III Is Not a Supervisor, and Not a Signatory of the Release
Two confusions cost real money, because both lead an evaluator to assume an authority that does not exist.
Supervision Is a Separate Requirement
§145.153 requires a certificated repair station to ensure it has a sufficient number of supervisors to direct the work performed under the repair station certificate and operations specifications, and requires supervisors to oversee work performed by individuals unfamiliar with the methods, techniques, practices, aids, equipment and tools being used. In the United States a supervisor must be appropriately certificated as a mechanic or repairman under part 65.
There is no numerical ratio anywhere in that section; the standard is a sufficient number. And a Level III certification does not make someone a supervisor under §145.153, any more than a supervisory position confers Level III authority. Two structures, two sets of evidence.
The Release Is a Part 65 Act
This is the one most often missed. §145.213 requires each article to be inspected before it is approved for return to service, requires the inspector making that determination to meet the requirements of §145.155, and provides that, except for individuals employed by a repair station outside the United States, only an employee appropriately certificated as a mechanic or repairman under part 65 is authorized to sign off on final inspections and maintenance releases.
So a Level III without a part 65 certificate cannot sign the release inside the United States, however senior the NDT authority is. The method authority and the release authority are different grants, and a shop that conflates them in its manual has created a finding out of nothing.
Note also what §145.213 does not say. It contains no rule that the person who performed the work may not inspect it. Many shops apply that separation, and where they do it comes from their own quality control manual rather than from the regulation, so it cannot be assumed at a supplier who never claimed it. Ask whether the separation exists, and ask where it is written. The broader set of duties on repair station inspection personnel is assembled from several sections, and this is the one that most often surprises people.
Where Part 145 Puts the Level Requirement
Nowhere, is the short answer, and the consequence is practical rather than academic. Section §145.155 requires inspection personnel to be thoroughly familiar with the applicable regulations and with the inspection methods, techniques, practices, aids, equipment and tools used to determine airworthiness, and proficient in using the inspection equipment and visual aids appropriate for the article. It names no level, no standard and no interval, and it contains no currency requirement.
The level requirement enters through two other doors. §145.211 requires a quality control manual with procedures for establishing and maintaining proficiency of inspection personnel, which is where the adopted standard, its levels and its recertification intervals are named. §145.151 requires the station to provide qualified personnel to plan, supervise, perform and approve for return to service, and to determine the abilities of noncertificated employees based on training, knowledge, experience or practical tests. Beyond that, the levels come from the standard the organization chose, which is why the choice between NAS 410 and SNT-TC-1A and the qualification program built on it determine what a Level II or Level III certificate in that shop actually required.
Common Misconceptions
“Level III Is the Senior Level II”
The levels are not a seniority ladder with the same job at each rung. Level II conducts and documents inspections under procedures; Level III interprets the codes, standards and regulatory documents that control the organization’s methods. A very experienced Level II has more hours and no authority over the procedure.
“A Level III Can Approve the Repair”
No. Level III authority concerns the inspection method and its governing documents, not the airworthiness of a repair design. Approving repair data is a separate regime with separate authority, and disposition of a finding follows the manufacturer’s approved data for that part number rather than the judgement of the person who ran the test.
“One Level III Covers All Methods”
Level III authority is method-specific in the same way Level II is. A person may hold Level III in one method and Level II or nothing in another, and a quality manual that names a single Level III without listing methods has left the most important detail out. Coverage is per method, and what a detection result actually proves varies by method as well.
What to Verify in a Shop
- Which methods does the shop hold Level III authority in, and is that authority internal or contracted?
- If contracted, what does the written agreement authorize that person to approve, and when was the last approval issued?
- Who signs the written procedure and the part-specific technique, and what is the revision history?
- Who administers and grades the examinations that qualify Level I and Level II personnel?
- For the method that will inspect this article, which level will perform the work and which level approved the technique?
- Who resolves an interpretation dispute, and is that route written down?
- Which part 65 certificated employee signs the final inspection and the maintenance release?
- What happens to procedure approvals if the Level III becomes unavailable?
Frequently Asked Questions
what is the difference between NDT Level II and Level III?
Authority over documents. AC 65-31B describes Level II as setting up and standardizing equipment, conducting tests, and interpreting, evaluating and documenting results in accordance with procedures, and Level III as interpreting the codes, standards and other regulatory documents that control the methods used by the organization. Level II works inside procedures; Level III decides what they say.
can a Level II sign an inspection report?
Within the scope the organization’s program grants, yes: documenting results in accordance with procedures is part of the FAA’s description of the level. Signing the final inspection and the maintenance release is a different act, and §145.213 restricts that, inside the United States, to an employee appropriately certificated as a mechanic or repairman under part 65.
does a repair station need a Level III on staff?
Part 145 does not require one, because it does not name levels at all. The requirement comes from the qualification standard the organization adopted and from customer contracts. Contracting the Level III function is common and acceptable, and it should be defined in a written agreement that names the methods and the documents covered.
is Level III certification method-specific?
Yes. Authority is granted per method, so a person may hold Level III in one method and a lower level, or none, in another. A quality manual naming a Level III without listing the methods has omitted the detail that decides whether your inspection was covered.
who approves an NDT written procedure?
The Level III authority the organization’s program designates, internal or contracted. That approval, together with the revision history behind it, is the evidence that the technique applied to your article was owned by someone authorized to own it.
is a Level III the same as a supervisor under part 145?
No. Section §145.153 requires a sufficient number of supervisors to direct the work, and inside the United States a supervisor must hold a part 65 mechanic or repairman certificate. Level III is an authority over inspection methods and their governing documents. The two can coincide in one person and neither implies the other.
Ask which methods the Level III authority covers and who signed the technique your part will be inspected under, then check that the person signing the maintenance release holds the part 65 certificate the regulation requires. Two authorities, two records, and a manual that blurs them creates an audit finding without any technical failure underneath it.
About AeroKool Aviation. AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, specializing in the repair and overhaul of environmental control system components — air cycle machines, cooling turbines, heat exchangers, refrigeration packages, valves and environmental control units — for commercial, regional, business jet, rotorcraft and military operators. The company was founded in 1959 and holds AS9110C and AS9100D registrations, with in-house PMA parts manufacturing and FAA DER repair engineering. Component capability is organized by aircraft category, manufacturer, model and component type in the component capability listing, down to individual part numbers such as this valve for a legacy regional platform.
This article is general technical information about nondestructive testing personnel levels and the authority attached to them. It is not approved data, it is not a maintenance procedure, and it does not replace the component maintenance manual, structural repair manual, service bulletin, airworthiness directive or other airworthiness data your organization is approved to use. Regulations, advisory material and industry qualification standards are revised, and the requirements that apply to a specific inspection depend on the method, the article, the customer specification, the operator’s approved program and the scope of the repair station’s certificate. Verify the applicable requirements against your own quality control system, the current revision of the standard your program adopts, and your principal inspector or Level III authority before performing or accepting any inspection.
Talk to AeroKool Aviation
AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, overhauling air cycle machines, cooling turbines, heat exchangers, valves and environmental control units for commercial, regional, business and military operators since 1959, with an AS9110C quality system and in-house PMA and DER engineering. If you have a component on the bench, a repeat removal you cannot explain, or a part number you cannot source, we will tell you what falls inside our ratings and what does not. Request a quote with the part number and the condition you need resolved, and the answer will name the scope it falls under.
Address
1495 S.E. 10th Avenue Hialeah, FL 33010-5984
eMail
aerokool@aerokool.com | sales@aerokool.com
Phone