Receiving inspector verifying FAA-PMA marking and part number against the release document for a valve

FAA PMA Marking Requirements: A Receiving Inspection You Can Defend

By the AeroKool Aviation team · Hialeah, Florida

FAA PMA marking requirements are the two identification elements that a Parts Manufacturer Approval article must carry, permanently and legibly, before it is offered for installation. The requirement is short enough to memorize and it is the only part of an article’s approval basis that can be verified at a bench without opening a data package.

That makes marking the highest-yield check in a receiving process, and it is routinely done from habit rather than from the rule. An inspector who knows what the four characters have to look like, what has to sit next to them, and what documented relief looks like when they are absent closes most sourcing questions in under a minute. An inspector working from memory generates findings.

What follows is a receiving programme rather than a maintenance procedure. It verifies identification and documentation, which is exactly where an obsolescence sourcing decision either holds up or falls apart.

Prerequisites: What You Need Before the First Article Arrives

Do not build this check around a single inspector’s judgement. Build it around three things that can be handed to a replacement on their first day.

Put the text of §45.15 in the work instruction

Do not paraphrase it. 14 CFR §45.15, “Marking requirements for PMA articles, TSO articles, and Critical parts,” is short, and a receiving instruction that reproduces paragraphs (a), (c) and (d) removes the argument about what is required. Paraphrase is where marking programmes drift.

Note the section title while you are there. It covers three categories in one section, and treating a critical part the way you treat an ordinary PMA article is the most common structural error in this check.

Separate §45.15 from §45.16 in your own paperwork

Section 45.16 is a different obligation entirely: it governs the marking of life-limited parts, and its operative language requires the holder of a type certificate or design approval for a life-limited part to “provide marking instructions, or must state that the part cannot be practicably marked.”

Two adjacent sections, two unrelated duties. If your receiving checklist runs them together, an inspector will eventually look for the wrong thing and pass or reject the wrong article.

Establish what the release document should say before you compare it

The marking check is a reconciliation, so it needs a second source. Decide in advance which release document you expect for each supplier type and each destination register, because an FAA Form 8130-3 and an EASA Form 1 do not certify the same thing.

Write the expectation down per supplier rather than per article. An inspector comparing an article against a documented expectation is doing a two-minute check; an inspector deciding on the spot what the paperwork should have said is doing research, and research at a receiving bench is where schedule pressure produces waivers.

Name the owner of the marking decision, and the escalation path

Decide in advance who accepts, who rejects and who may not do either. A receiving inspector should be able to accept a compliant article and segregate a non-compliant one without seeking permission, and should not be able to accept a discrepancy. That authority split is the whole control: it puts the fast decision at the bench and the slow decision somewhere it can be recorded.

Name the person the escalation goes to as well. An escalation path that ends in “ask whoever is available” is not a path, and it is the condition under which an article with a marking question quietly reaches a bench.

Step 1: Read the Marking Against §45.15, Not Against Habit

Start with the rule, because the rule is narrower than most inspectors expect and the surplus expectations cause the false rejections.

verify the two required elements, and only those two

Section 45.15(a) requires the manufacturer of a PMA article to “permanently and legibly mark—” and then names two things: “Each PMA article, with the PMA holder’s name, trademark, symbol, or other FAA approved identification and part number,” and “The letters ‘FAA-PMA’.”

That is the whole requirement for a standard article. Identification plus part number, and the four characters. Do not reject an article for lacking a marking §45.15 does not require, and do not accept one that is missing either of the two it does.

check permanence and legibility as separate attributes

Both adjectives in the rule do work. A marking that has been applied with a label that peels, or stamped so lightly that it disappears under handling, fails the permanence test even though the characters were once present. A marking crowded into a radius or overstruck by a later operation fails legibility even though it is permanent.

Record which of the two failed. The two conditions have different causes upstream and a supplier conversation goes differently depending on the answer. A permanence failure usually points at the marking method the supplier chose; a legibility failure often points at an operation performed after marking, which is a different and more serious question about what happened to the article.

Note also where the obligation to mark actually sits. Section 21.316, on the responsibilities of a Parts Manufacturer Approval holder, requires the holder to mark articles in accordance with Part 45, which means marking is a continuing duty of the approval holder rather than a courtesy of whoever shipped the box. An article arriving unmarked from a distributor is not a distributor problem in regulatory terms. It is a question about the article.

Step 2: Sort the PMA Article From a TSO Article and From a Critical Part

The same section covers three categories, and the check changes by category. Sort before you inspect.

identify the approval category before you look for the marking

A PMA article carries the elements of §45.15(a). A TSO article is a different approval and it answers a different question about installation, so do not expect “FAA-PMA” on it. An article described as OEM is a commercial label, not a regulatory category, and it carries no §45.15(a) obligation at all.

Getting this wrong in either direction wastes time. Expecting PMA marking on a TSO article produces a false finding; accepting a PMA article without it produces a real one.

apply the critical-part rule where it applies

Section 45.15(c) adds a unique serial number for critical parts. That is an additional element on top of the two in paragraph (a), not a substitute for them.

A critical part that carries identification and “FAA-PMA” but no unique serial number is incompletely marked. Establish how your organization determines whether an article is a critical part before the article is in front of you, because that determination is not made at the bench.

Step 3: Handle the Article That Cannot Be Marked Directly

This is the case that generates the most unnecessary rejections, and the rule provides for it explicitly.

look for the documented relief, not for the marking

Section 45.15(d) provides that where the FAA finds a part or article “too small or otherwise impractical to mark” with the required information, the manufacturer must attach that information to the part or its container instead. Small hardware inside an air cycle machine or a valve assembly falls into this case routinely.

So the question on a small article is not whether it is marked. It is whether the information travels with it, and whether the relief is documented. Absence of marking with relief is a different situation from absence of marking without it.

keep the attached information with the article through your own process

The relief only works while the information stays attached. An article that arrives compliant in a bag with its data attached, and is then decanted into a bin, has been made non-compliant by the receiving process rather than by the supplier.

Write that into the instruction. The moment the container is discarded, the identification is gone and cannot be reconstructed.

That is a real operational constraint and it is worth designing around rather than warning about. Kitting, decanting, cleaning and any repackaging step between receiving and the bench is a point where attached identification can be separated from its article, and once separated it cannot be restored by inference. Two articles of the same type, one compliant and one not, become two articles of unknown status the moment their containers are pooled.

The instruction therefore has to say where the attached information goes, not only that it must be retained. Either the article stays in its original container until it is needed, or the information is transferred under a controlled step that records the transfer. Anything less relies on nobody being in a hurry.

Step 4: Reconcile the Marking With the Paperwork and Decide on a Discrepancy

The marking is one source. On its own it proves less than it appears to.

compare the marking against the release document and the purchase order

Match the part number on the article to the part number on the release document and to what was ordered. Match the identification on the article to the party the release document says produced it. A marking that is internally perfect and inconsistent with its paperwork is the more serious finding of the two.

Ask the further question the marking cannot answer: for which type-certificated product is the approval issued, and does it cover the configuration you intend to install on? A PMA is tied to a product, not to a part number, and no marking encodes that.

note that the marking does not encode the substantiation route either

Nothing on the article says whether the design was substantiated by identicality under a licensing agreement, identicality without one, or test and computation. That route decides international acceptance, so it has to be asked rather than inspected.

If the aircraft is on a European register, treat that question as part of receiving rather than part of purchasing. It is cheaper to hold an article than to install one that will be questioned.

decide the disposition, and record the reason

Segregate before you decide. An article whose marking or reconciliation fails goes to a controlled location, not back to the shelf and not onto the bench, and the record says which element failed and against which paragraph.

Where the profile suggests the article’s provenance is in doubt rather than merely undocumented, AC 21-29D, “Detecting and Reporting Suspected Unapproved Parts”, sets out the indicators and the reporting route, and designates FAA Form 8120-11 for the report. The line between suspected and undocumented is worth understanding before you have to draw it under time pressure.

Common Marking Problems and How to Trace Them

Three patterns account for most of what a receiving function actually sees.

the marking is present but the identification is not the seller

This is normal in a distribution chain and it is not by itself a defect. What matters is whether traceability reaches the identified holder rather than stopping at the current seller. Trace it forward from the marking, not backward from the invoice.

Where the chain will not close, the article is undocumented regardless of how good the marking looks. Distributor accreditation programmes such as the voluntary programme described in FAA AC 00-56B exist precisely to shorten this conversation, and asking whether a supplier participates is a reasonable qualification question.

the article was marked and then reworked

Overstruck, polished-out or partially machined markings usually mean the article has been through an operation since it was marked. Establish what that operation was and who performed it under what data before treating the marking as valid.

An article whose marking has been altered is a records problem and possibly a conformity problem. Do not resolve it at the bench.

the marking is right and the part number has migrated

A part number that appears on more than one model or variant will sometimes match your order while sitting outside the approval’s product coverage. The marking is correct, the paperwork is correct, and the article is still not eligible for your configuration.

This is the failure mode that a marking-only check cannot catch, which is the argument for Step 4 existing at all.

Warning Signs of a Minimum-Standard Approach

A receiving function that treats marking as a formality shows it in recognizable ways. Watch for an instruction that says “check for FAA-PMA” and nothing else, with no reference to the paragraph, no mention of the part number element, and no provision for the small-part relief. Watch for a checklist that runs §45.15 and §45.16 together. Watch for critical parts moving through the same lane as ordinary articles, with no step that asks the question.

Watch for discrepancies closed by a telephone call and no record, and for segregation that consists of a note on the bin. And watch for a supplier who answers a marking question with an assurance rather than with a document, because an assurance is not a marking and an invoice is not an approval basis.

Two more are worth adding to the list because they show up in audits rather than in daily work. The first is a receiving function with no record of what was verified — only a stamp saying the article was accepted, which tells an auditor nothing about which elements were checked or against what. The second is an instruction that has not been revised since Part 45 was last amended, which is a documentation problem that will outlast whoever wrote it.

Neither of those affects a single article. Both affect every article that passed through while the condition existed, which is what makes them the expensive findings.

Expected Outcome: A Receiving Record That Survives an Audit

Done properly, this programme produces something narrow and useful: for each article, a record of which approval category it falls in, which elements of §45.15 were verified, what relief applied if the article was not marked directly, how the marking reconciled with the release document and the order, and what happened to anything that failed.

That record is what an auditor follows, and it is also what protects the shop months later when a component comes back and the question is what was known at intake. Marking is not paperwork. It is the only part of the approval basis that arrives attached to the article, which is exactly why it deserves a written programme rather than an experienced pair of eyes.

Frequently Asked Questions

what marking is required on an FAA PMA part?

Two elements, both permanent and legible, under §45.15(a): the PMA holder’s name, trademark, symbol or other FAA-approved identification together with the part number, and the letters “FAA-PMA.” Critical parts additionally carry a unique serial number under paragraph (c).

what if the part is too small to be marked?

Section 45.15(d) provides for it. Where the FAA finds a part or article too small or otherwise impractical to mark with the required information, the manufacturer must attach that information to the part or its container instead. The practical consequence at receiving is that the information has to stay with the article through your own process, not only through the supplier’s.

is a part without FAA-PMA marking automatically unapproved?

No, and treating it that way produces false rejections. It may be a TSO article, an article produced under a production certificate, or a small article covered by the relief in paragraph (d). What it cannot be is a PMA article offered without either the marking or documented relief.

does the marking tell you which aircraft the part is approved for?

No. The marking carries identification and a part number, and nothing about the type-certificated product the approval covers. That question is answered from the approval itself, which is why a matching part number is a reason to check rather than a conclusion.

is §45.15 the same as the life-limited parts rule?

No. Section 45.15 covers marking requirements for PMA articles, TSO articles and critical parts. Section 45.16 covers the marking of life-limited parts and places its duty on the holder of a type certificate or design approval, requiring marking instructions or a statement that the part cannot be practicably marked. Keep them separate in your checklist.

what should you do with an article whose marking does not match its paperwork?

Segregate it to a controlled location before deciding anything, and record which element failed and against which paragraph. Where the profile suggests the provenance is in doubt rather than merely undocumented, AC 21-29D sets out the indicators and designates FAA Form 8120-11 for reporting.


Write the paragraph numbers into the instruction, sort by approval category before you inspect, and give the small-part relief its own step. A marking check built that way takes a minute per article and closes questions that otherwise surface a year later, with the component already installed.

About AeroKool Aviation. AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, specializing in the repair and overhaul of environmental control system components — air cycle machines, cooling turbines, heat exchangers, refrigeration packages, valves and environmental control units — for commercial, regional, business jet, rotorcraft and military operators. The company was founded in 1959 and holds AS9110C and AS9100D registrations, with in-house PMA parts manufacturing and FAA DER repair engineering. Its engineering, manufacturing and repair management programs are described on the site, and component capability is organized by aircraft category, manufacturer, model and component type in the component capability listing, down to individual part numbers such as this valve for a legacy regional platform.

This article is general technical information about the marking of Parts Manufacturer Approval articles and the reconciliation of that marking at receiving inspection. It is not approved data, it is not a maintenance or inspection procedure, and it does not replace the component maintenance manual, service bulletin, airworthiness directive or the receiving inspection procedures your organization is approved to use. Regulations and advisory material are revised, and what a specific article must carry depends on its approval category, whether it is a critical part, and any relief documented for it. Verify the applicable marking requirements against the current text of Part 45, your own quality system, and your FAA principal inspector before accepting, rejecting or installing any article.

Talk to AeroKool Aviation

AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, overhauling air cycle machines, cooling turbines, heat exchangers, valves and environmental control units for commercial, regional, business and military operators since 1959, with an AS9110C quality system and in-house PMA and DER engineering. If you have a component on the bench, a repeat removal you cannot explain, or a part number you cannot source, we will tell you what falls inside our ratings and what does not. Request a quote with the part number and the register the aircraft is on, and the answer will name the approval basis.

Address
1495 S.E. 10th Avenue Hialeah, FL 33010-5984
eMail
aerokool@aerokool.com | sales@aerokool.com
Phone
305.887.6912 | 800.458.4255

Scroll to Top

Have Questions Or Need Information?

Please fill out the form below to contact us and we will get back to you as soon as possible.
Request a Quote
Choose one for Sales and Repair Services
We're committed to your privacy. AeroKool Aviation uses the information you provide to us to contact you about our relevant content, products, and services. You may unsubscribe from these communications at any time. For more information, check out our Privacy Policy.

Looking for parts?

You can search by Part Number or Aircraft Model

Search for Parts

Browse our extensive inventory

Note: You can search by part number

Your Aircraft

Browse our extensive inventory

Note: You can search by aircraft name