Inside a cockpit, multiple gauges and instruments are visible, highlighting dual-release capabilities for enhanced control.

EASA Form 1 and FAA Form 8130-3: What Each One Certifies, and What Dual Release Requires

By the AeroKool Aviation team · Hialeah, Florida

An FAA Form 8130-3 and an EASA Form 1 are release documents issued under two different regulatory systems, and they are not translations of one another. Each is the instrument by which its own system says a component may be returned to service, and each is issued under conditions the other system does not necessarily recognize.

That distinction is easy to lose because the two forms look similar on a desk and are often called the same thing in conversation. Treating them as interchangeable is how a component arrives at a European operator with paperwork that is complete, correct and unusable for the register the aircraft is on.

A release document is not a formality attached to a finished job. It is the part of the job that determines whether the work counts, and in an obsolescence situation where the component has already been difficult to obtain, a release that does not support the register turns a solved problem back into an open one.

Two Documents, Two Systems, One Component

Start with what each system is actually asserting, because the assertions are not the same.

What a release document is for

A release document travels with a component and tells the next holder that the work performed on it has been approved for return to service by an organization competent to say so. It is the bridge between a maintenance record held by the shop and an installation decision made by someone else, possibly years later and on another continent.

Because it is a bridge, it has to be legible on both banks. A document that satisfies the issuing system and not the receiving one has failed at the only job it had.

Why the two systems do not simply recognize each other

The two systems have separate legal bases, separate approving bodies and separate concepts of who may release what. Mutual recognition, where it exists, exists because a bilateral instrument creates it — not because the documents resemble one another.

The parent instrument is the agreement between the United States and the European Community on cooperation in the regulation of civil aviation safety, concluded on the European side by Council Decision 2011/719/EU of 7 March 2011. Its Annex 1 covers airworthiness and environmental certification; its Annex 2 covers maintenance, and refers to “the Joint Maintenance Coordination Board provided for in paragraph 3.1.1 of Annex 2.” Release of a maintained component sits on the maintenance side, which is a different annex from the one that governs acceptance of a new PMA article.

What an FAA Form 8130-3 Is

The form is stable. The order that governs its completion changed recently, and most published guidance has not caught up.

The form itself

FAA Form 8130-3 is titled “Authorized Release Certificate, Airworthiness Approval Tag,” and the edition in the FAA’s forms library carries a 2014 date. Both halves of that title do work: it is an authorized release certificate in the maintenance sense and an airworthiness approval tag in the production sense, which is part of why the same form appears in situations that feel unrelated.

The order that governs it changed in September 2025

This is the detail worth checking in your own procedures. Order 8130.21H was cancelled on 25 September 2025. The current instrument is FAA Order 8130.21J, “Completion of FAA Form 8130-3 under Part 21,” effective the same date.

Note what happened to the title. It was shortened, and it was narrowed explicitly to Part 21. That is a meaningful change in framing for anyone whose procedures cite the previous order for maintenance-side use of the form, and a procedure citing 8130.21H today is citing a cancelled order.

What an EASA Form 1 Is

Similar function, different establishment, and the establishment is worth knowing precisely because it is asked about in audits.

The document and its name

The canonical wording is “Authorised Release Certificate — EASA Form 1.” Note the British spelling of “Authorised” in the European instrument, which matters when searching for it and when reproducing the title in a procedure.

It is established in two places, and not where people assume

The Form 1 appears as Appendix I to Annex I (Part 21) of Regulation (EU) No 748/2012, the initial airworthiness regulation, in its production-release role. It also appears as Appendix II to Annex I (Part-M) of Regulation (EU) No 1321/2014, the continuing airworthiness regulation.

Two establishments for one document, mirroring the dual production-and-maintenance character of the FAA form. What is worth not assuming is that it sits in an appendix to Part-145; that is a common assertion and it is not what the verified text shows. If a procedure needs to cite the establishing provision, cite one of the two above.

How a US Repair Station Releases to a European Register

This is the mechanism the article exists to explain, and the conditions are more specific than most shops expect.

The scope is borrowed, not granted

An EASA Part-145 approval issued to a repair station in the United States does not create an independent scope of work. It is expressly tied to the FAA certificate underneath it: the scope is limited to that specified on the 14 CFR Part 145 repair station Air Agency Certificate and the associated operations specifications, and it may not exceed the permitted EASA Part-145 ratings.

Read that carefully, because it settles a recurring argument. A shop cannot widen what it does for European customers by obtaining a European approval. The European approval rides on the FAA scope, and the data question underneath the work is unchanged by which register the aircraft is on.

The release is made on the FAA form

The mechanism surprises people who expect a European approval to produce a European form. Release and return to service of components under such an approval is made using FAA Form 8130-3, not an EASA Form 1.

That is the practical heart of dual release from a US shop: the document is the American one, and what makes it acceptable on the European side is the approval standing behind it plus the way the certificate is completed.

And the certificate has to reference both approvals

The completed certificate must reference both the EASA approval number and the FAA Air Agency Certificate number. A release citing only one of the two is incomplete for this purpose, whatever else is correct about it.

That single requirement is the fastest quality check available on an inbound release from a US shop, and it is the one most often missed. Two numbers, both present, both legible.

It is worth understanding why the requirement exists rather than treating it as a formatting rule. The two numbers together are what make the document self-explaining: the FAA certificate number identifies the organization and the scope the work was performed under, and the EASA approval number identifies the basis on which the European system accepts it. Either number alone leaves the reader holding half an answer, and the reader is often someone assessing the component years later with no access to the shop that released it.

Note also that the currency of the approval is measured on the date the work was performed. An approval that lapses afterwards does not invalidate a release properly made while it was in force, and an approval obtained afterwards does not repair a release made when it was not.

One caution about the guidance layer

Below the agreement and its annexes sits a maintenance guidance document that the two authorities maintain jointly, and it is revised. Rather than reproduce a revision number here that may not be current, the honest instruction is to confirm the current revision with your competent authority or your FAA principal inspector before relying on any procedural detail drawn from it.

A citation to a superseded revision of a guidance document reads exactly like a citation to a cancelled order. Both invite a question about the rest of the document.

What the Release Does Not Certify

Three limits, each of which someone eventually assumes away.

It does not establish eligibility for a specific installation

A release says work was performed and approved for return to service. It does not say the component is eligible for the particular aircraft in front of you, which is a question about the approved configuration, the part number’s coverage and, for a new article, its approval basis.

For a PMA article on a European-registered aircraft, that eligibility question has its own conditional answer, and a release document does not resolve it.

It does not describe the work in the words you may assume

The words used on a release and in the record are regulated. Under 14 CFR §43.2, no person may describe a component as overhauled unless it has been “disassembled, cleaned, inspected, repaired as necessary, and reassembled” and tested against approved or acceptable standards, and rebuilt carries a stricter test again.

What each of those words commits the shop to is worth reading before interpreting a tag, because two releases carrying different words describe genuinely different work.

It does not approve the design of anything

A release is a maintenance instrument. Where the work involved a repair whose design needed approval, that approval is a separate act by a separate body, and in the European system it runs through Part 21 Subpart M rather than through Part-145 at all.

Where This Goes Wrong

Two patterns, both cheap to prevent and expensive to discover late.

The release that does not support the register

The first is the component that arrives with a technically perfect release for the wrong system, or with a release citing only one of the two required approval numbers. The work is done, the money is spent, and the operator cannot use the component until the paperwork is corrected — if it can be corrected, which depends on what was in place at the time the work was performed rather than on what can be added afterwards.

Establish the register before the work is authorized, not before the component ships. The register determines what the release has to be, and a release cannot be retrofitted with an approval that did not exist.

The assumption of symmetry

The second is broader and it produces the first. A shop that assumes the two systems mirror each other will assume a European approval grants scope, that a European form is required, that a design approval travels with a maintenance approval, and that a guidance revision from a few years ago still describes the process.

None of those is true. The systems are connected by a bilateral instrument, and a connection is not a mirror.

Questions to Settle Before the Component Ships

Ask these when the work is authorized, which is earlier than most organizations ask them.

Questions about the release itself

On which register will the aircraft be operated, and does that answer hold for the life of this component? Which release document will accompany it, and under which approval was the work performed? If the work was performed in the United States for a European-registered aircraft, does the completed certificate reference both the EASA approval number and the FAA Air Agency Certificate number? And is the approval standing behind the release current on the date the work is performed, rather than on the date the quotation was issued?

Questions about what sits underneath it

Was the work classified major or minor, and what data authorized it? Which term will appear on the release and in the record, and does it match what was actually done under §43.2? Was the scope of the work inside the shop’s ratings and operations specifications, given that a European approval borrows that scope rather than extending it? And if a repair design needed approval, who approved it and under which regime?

Frequently Asked Questions

what is the difference between an EASA Form 1 and an FAA Form 8130-3?

They are the release documents of two different regulatory systems, not translations of each other. The FAA form is titled “Authorized Release Certificate, Airworthiness Approval Tag.” The European one is the “Authorised Release Certificate — EASA Form 1.” Each is issued under its own system’s conditions, and mutual acceptance exists only where a bilateral instrument creates it.

which form does a US repair station use to release a component to a European register?

FAA Form 8130-3. An EASA Part-145 approval issued to a repair station in the United States provides for release and return to service of components using the FAA form, rather than requiring an EASA Form 1. What makes the release acceptable is the approval standing behind it and the way the certificate is completed.

does a European approval let a US shop do more work?

No. The scope is limited to that specified on the 14 CFR Part 145 repair station Air Agency Certificate and its operations specifications, and it may not exceed the permitted EASA Part-145 ratings. A European approval borrows the FAA scope; it does not extend it.

which order governs completion of FAA Form 8130-3?

Order 8130.21J, “Completion of FAA Form 8130-3 under Part 21,” effective 25 September 2025. Order 8130.21H was cancelled on that date. Note that the newer title is explicitly narrowed to Part 21, which matters for procedures that cited the previous order.

where is the EASA Form 1 established in the regulations?

In two places: as Appendix I to Annex I (Part 21) of Regulation (EU) No 748/2012, and as Appendix II to Annex I (Part-M) of Regulation (EU) No 1321/2014. It is often asserted to sit in an appendix to Part-145, which is not what the verified text shows, so cite one of the two above.

what makes a dual release incomplete?

Most often a missing approval number. Where a US repair station releases a component under an EASA Part-145 approval, the completed certificate must reference both the EASA approval number and the FAA Air Agency Certificate number. A release citing only one of the two is incomplete for that purpose regardless of what else is correct.


Decide the register when the work is authorized rather than when the component ships, and check the release for two approval numbers rather than one. Those two habits catch nearly everything that goes wrong here, and both cost nothing at the point where they are cheap.

About AeroKool Aviation. AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, specializing in the repair and overhaul of environmental control system components — air cycle machines, cooling turbines, heat exchangers, refrigeration packages, valves and environmental control units — for commercial, regional, business jet, rotorcraft and military operators. The company was founded in 1959 and holds AS9110C and AS9100D registrations, with in-house PMA parts manufacturing and FAA DER repair engineering. Its engineering, manufacturing and repair management programs are described on the site, and component capability is organized by aircraft category, manufacturer, model and component type in the component capability listing, down to individual part numbers such as this air cycle machine for a wide-body platform.

This article is general technical information about release documents in the United States and European airworthiness systems. It is not approved data, it is not a maintenance procedure, and it does not replace the component maintenance manual, service bulletin, airworthiness directive or the release procedures your organization is approved to use. Regulations, bilateral instruments, orders and joint guidance are revised, and what a specific release must contain depends on the approvals held on the date the work is performed, the scope of those approvals and the register of the aircraft. Verify the applicable release requirements and the current revision of any joint maintenance guidance with your FAA principal inspector or EASA competent authority before authorizing or accepting any work.

Talk to AeroKool Aviation

AeroKool Aviation is an FAA-certificated repair station in Hialeah, Florida, overhauling air cycle machines, cooling turbines, heat exchangers, valves and environmental control units for commercial, regional, business and military operators since 1959, with an AS9110C quality system and in-house PMA and DER engineering. If you have a component on the bench, a repeat removal you cannot explain, or a part number you cannot source, we will tell you what falls inside our ratings and what does not. Request a quote with the part number and the register the aircraft is on, and the answer will name the release you can expect.

Address 1495 S.E. 10th Avenue Hialeah, FL 33010-5984 eMail aerokool@aerokool.com | sales@aerokool.com Phone 305.887.6912 | 800.458.4255

Scroll to Top

Have Questions Or Need Information?

Please fill out the form below to contact us and we will get back to you as soon as possible.
Request a Quote
Choose one for Sales and Repair Services
We're committed to your privacy. AeroKool Aviation uses the information you provide to us to contact you about our relevant content, products, and services. You may unsubscribe from these communications at any time. For more information, check out our Privacy Policy.

Looking for parts?

You can search by Part Number or Aircraft Model

Search for Parts

Browse our extensive inventory

Note: You can search by part number

Your Aircraft

Browse our extensive inventory

Note: You can search by aircraft name